Document Search: Search Now
Northeast Power Coordinating Council - Cross Border Regional Entity Home Robert Moses Hydro Electric Dam courtesy of New York Power Authority Raddison Substation courtesy of TransEnergie HydroQuebec NY Skyline courtesy of ConEd

NPCC Procedures, designated as Type "C" documents and identified as NPCC Document C-nn, provide for uniform implementation, interpretation and monitoring of conformance with the general criteria, guides and reporting requirements of the Type "A" and "B" documents. Type "C" documents are prepared and revised by one of the five NPCC Task Forces which is responsible for the discipline addressed in the given procedure.


Start Date:         End Date:        

Procedures

DocumentPosted
C-16 Procedure for Review of New or Modified BPS SPS (retired;content transferred to D#7 App.B) 02/04/2010
Protection System Review Form (formerly C-22 forms)-R1 12/15/2009
C-30 Procedure for Task Force on System Protection Review of Disturbances and Protection Misoperations 12/02/2009
C-39 Procedure to Collect Major Disturbance Sequence Data 12/02/2009
C-40 Procedures for Inter-AREA Voltage Control(retired;content transferred to D#1 App.G & D#2 App.B) 12/01/2009
C-04 Monit.Procedure for Guides Inter-AREA Volt Control(retired;content transferred to D#1 App. G) 12/01/2009
C-13 Operational Planning Coordination (retired; content transferred to D#1 App. F) 12/01/2009
C-22 Proced.for Reporting & Review Proposed BPS Prot.Sys.(retired;content transferred to D#4 App.A ) 12/01/2009
C-18 Procedure for Test & Analysis Extreme Contingencies(retired;content transferred to D#1 App.C) 12/01/2009
C-35 Incorporated within Directory#8 System Restoration 07/15/2009
C-38 Procedure for Operating Reserve Assistance 01/08/2009
C-37 Operating Procedures for Ace Diversity Interchange 08/14/2008
C-42 Procedure for Reporting and Reviewing System Disturbances 08/14/2008
C-43 Operational Review for the Integration of New Facilities 08/14/2008
C-25 Data Contacts List 07/25/2008
C-17 Appendix A--Reporting Form 11/08/2007
C-17 Procedures for Monitoring and Reporting Critical Operating Tool Failures 11/08/2007
C-25 Procedure to Collect Power System Event Data 09/25/2007
C-44 NPCC, Inc. Regional Methodology and Procedures for Forecasting TTC and ATC 09/25/2007
C-29 Procedures for System Modeling:Data Requirements and Facility Ratings 05/08/2007
C-15 Procedures for Solar Magnetic Disturbances Which Affect Electric Power Systems 01/11/2007
C-39 Forms C-39 Forms and Instructions 11/30/2006
C-00 Listing of NPCC Documents by Type 08/10/2006
C-33 Procedure for Analysis and Classification of Dynamic Control Systems 04/06/2006
C-36 Procedures for Communications During Emergencies 08/18/2005
12