Non-Standards in Development

 

B-01: Guide for the Application of Autoreclosing on the Bulk Power System (Details)
03/23/2017
A-01: Criteria for Review and Approval of Documents (Details)
02/14/2017
Directory#8 System Restoration: Directory#8 (Details)
02/13/2017
C-29 Procedures for System Modeling: Data Requirements and Facility Ratings: TFSS Retirement Recommendation (Details)
12/13/2016
TFSP Criteria Clarification: Directory#4 System Protection Criteria (Details)
11/21/2016
C-45: Procedure for Analysis and Reporting of Protection System Misoperations (Details)
10/27/2016
Directory#11: Directory#11 Disturbance Monitoring Equipment Criteria (Details)
10/27/2016
Directory#5 ---Criteria Clarification: Directory#5---- Reserve (Details)
08/01/2016
Directory#1---Criteria Clarification: Directory#1---Design and Operation of the BPS (Details)
08/01/2016
TFCO Retirement Recommendation: Directories #9 and #10 Verification of Real and Reactive Power (Details)
08/01/2016
C-15: Procedures for Solar Magnetic Disturbances Which Affect Electric Power Systems (Details)
05/16/2016
C-01: NPCC Emergency Preparedness Communications Procedures (Details)
05/11/2016
TFSP Retirement Recommendation: C-30 and C-39 (Details)
03/24/2016
TFIST Retirement Recommendation: B-27 (Details)
03/04/2016
C-29---Revised: Procedure for System Modeling:Data Reqmnts & Facility Ratings (Details)
02/20/2016
Directory#8---Criteria Clarification: Directory#8---System Restoration (Details)
11/09/2015
Directory#1: Directory#1 Design and Operation of the Bulk Power System (Details)
09/30/2015
Directory#4: Directory#4 System Protection Criteria---TFSP Revisions (Details)
09/30/2015
Directory#3---Criteria Clarification: Directory#3 Maintenance Criteria BPS Protection---Criteria Clarification (Details)
01/15/2015
Directory#3 Retirement: Directory #3 Maintenance Criteria BPS Protection ---Retirement (Details)
10/17/2014
Directory Development and Revision Manual: Directories (Details)
10/06/2014
Directory#12: Automatic Underfrequency Load Shedding Program Requirements (Details)
07/15/2013
Directory#7: NPCC Regional Reference Directory #7 Special Protection System (Details)
07/15/2013
Directory#5: Reserve (Details)
10/12/2012
B-01: Draft Revised NPCC Guide for the Application of Autorelosing to the Bulk Power System (Details)
08/27/2012
C-17: Procedures for Monitoring and Reporting Critical Opertaing Tool Failures (Details)
05/07/2012
Directory#6: Reserve Sharing Groups (Details)
04/09/2012
Reliability Practices: Coordination of NPCC Reliability Practices (Details)
01/01/2012
Directory 9 and Directory 10: Phase 2 Reformatting (Details)
12/29/2011
Glossary: NPCC Glossary of Terms (Details)
11/01/2011
CEAP: Cost Effectiveness Analysis Procedure "CEAP" For NPCC Regional Reliability Standards (Details)
09/19/2011
A-07: Glossary of Terms (Details)
09/08/2011
B-21: Guide for Analysis and Reporting of Protection System Misoperations (Details)
06/01/2011
C-33: Procedure for Analysis and Classification (Details)
03/27/2011
Directory# 12: UFLS Program Requirements (Details)
01/21/2011
UFLS: Implementation Plan (Details)
01/21/2011