Event Analysis - 8 Lessons Learned posted 2021-06-03


Published
June 3, 2021
Eight Lessons Learned and Regional Insights posted at this link
Seven are EMS/SCADA
- LL20150604 - EMS Recovery Strategy
- LL20150901 - Loss of EMS communication due to lack of database validation of RTU configurations.
- LL20151001 - Appropriate UPS design and implementation. Review of temporary measures transitioning to permanent solutions.
- LL20151202 - Lack of QOS (Quality of Service) on network devices providing priority traffic throughput.
- LL20180802 - Firewall Failure After Time Limit Exceeded
- LL20190801 - Loss of Monitoring or Control Capability due to Power Supply Failure
- LL20190901 - Risks Posed by Firewall Firmware Vulnerabilities
- LL20200403 - Loss of Automatic Generation Control During Routine Update
One Transmission
- LL20151201 - SOL and IROL Monitoring Tool Leads to Unnecessary Manual Load Shedding