News
•
NPCC
Migration of Technical Feasibility Exceptions (TFEs) to Align Due by 9/30/2021


Published
September 17, 2021
NPCC registered entities will need to enter their existing TFE data into Align by 9/30/2021.
Asset Details: Individual asset in the TFE total asset count will not go into Align. Instead, this information will be entered in the TFE - Asset Import SEL Template spreadsheet which will be uploaded into the Secure Evidence Locker (SEL) as you create the TFE in Align.
NPCC is dedicated to the continued reliability of the bulk power system in Northeastern North America
